基于改进蜜蜂算法的报废汽车发动机曲柄连杆机构拆卸线平衡问题研究

詹长书, 黄信悦, 高言龙   

  1. 东北林业大学机电工程学院,哈尔滨 150040
  • 收稿日期:2024-09-25 出版日期:2025-05-18 发布日期:2025-05-30
  • 作者简介:詹长书,博士,副教授,主要研究方向为汽车空气弹簧悬架的控制研究、载运工具创新。E-mail:cshuzhan@163.com;黄信悦,硕士研究生,主要研究方向为废旧产品拆解、绿色物流。E-mail:h1220xy@163.com;高言龙,硕士研究生,主要研究方向为绿色物流。E-mail:gaoyanlong@nefu.edu.cn

Study on the disassembly line balancing problem of crank train of end-of-life car engine based on improved bees algorithm

ZHAN Changshu, HUANG Xinyue, GAO Yanlong   

  1. College of Mechanical and Electrical Engineering,Northeast Forestry University,Harbin 150040,China
  • Received:2024-09-25 Online:2025-05-18 Published:2025-05-30

摘要: 随着全球汽车保有量的不断增加,汽车报废带来的环境和资源问题日益凸显,报废汽车的拆卸、回收和再制造是解决该问题的主要途径。由于报废汽车内部结构复杂,在实际拆卸作业中,各拆卸任务间存在着相互干扰的顺序相依关系;此外,由于零件的折旧程度不同,拆卸过程中还存在着固有的不确定性,从而影响拆卸效率。为了获得更加贴合实际的拆卸方案,首先,应用随机规划模型对不确定信息进行表征,以拆卸时间、拆卸能耗及均衡空闲时间为目标建立了不确定环境下的多目标顺序相依拆卸线平衡问题模型;然后,通过创新搜索算子改进蜜蜂算法,引入轮盘赌策略自适应更新算子权重;最后,以报废汽车发动机曲柄连杆机构为案例进行研究,验证所提模型和算法的有效性。

关键词: 拆卸线平衡问题, 顺序相依关系, 不确定性, 改进蜜蜂算法

Abstract: With the increasing global number of vehicles, end-of-life cars pose growing environmental and resource challenges. Disassembly, recycling, and remanufacturing are key solutions. However, their complex structure creates sequence dependence among disassembly tasks, while part deterioration introduces uncertainty, affecting efficiency. To develop a practical disassembly approach, it first formulates a stochastic programming model to represent uncertain information, establishing a multi-objective sequence-dependent disassembly line balancing problem under uncertainty, optimising time, energy consumption, and idle time equilibrium. Next, an improved bees algorithm with innovative search operators is proposed, incorporating a roulette wheel strategy for adaptive weight updates. Finally, a case study on a crank train from a scrapped engine validates the model and algorithm.

Key words: Disassembly Line Balancing Problem (DLBP), sequence dependence, uncertainty, Improved Bees Algorithm (IBA)