[1] |
ZHAN Changshu, HUANG Xinyue, GAO Yanlong.
Study on the disassembly line balancing problem of crank train of end-of-life car engine based on improved bees algorithm
[J]. Modern Manufacturing Engineering, 2025, 536(5): 106-114.
|
[2] |
CHEN Ziyan, LI Zengcan, GUAN Zailin.
Research on flexible job shop batch scheduling problem with variable sublots based on improved sparrow search algorithm
[J]. Modern Manufacturing Engineering, 2025, 535(4): 11-24.
|
[3] |
YANG Xingchen, CHANG Daofang.
Research on collaborative mixed flow production scheduling of multiple automobile factories in a limited buffer zone
[J]. Modern Manufacturing Engineering, 2024, 527(8): 9-18.
|
[4] |
PEI Honglei.
Joint scheduling of multiple flexible workshops with serial and parallel heterogeneous process constraints
[J]. Modern Manufacturing Engineering, 2024, 525(6): 15-21.
|
[5] |
LI Zengcan, DING Linshan, GUAN Zailin.
Research on flexible job shop batch scheduling problem based on improved grey wolf optimization algorithm
[J]. Modern Manufacturing Engineering, 2024, 523(4): 13-25.
|
[6] |
TANG Hongwei, GAO Fangkun, DENG Jiaxin, DING Xiang, LUO Jiaqiang, WANG Junquan.
Research on route planning of material transport vehicle based on ant colony algorithm
[J]. Modern Manufacturing Engineering, 2024, 521(2): 24-30.
|
[7] |
YAN Fuqian, SHI Zhiyuan, WANG Liwen.
Dynamic energy-saving batch scheduling of flexible job shop problem based on improved grey wolf optimization algorithm
[J]. Modern Manufacturing Engineering, 2024, 520(1): 24-32.
|
[8] |
.
[J]. Modern Manufacturing Engineering, 2023, 516(9): 9-17.
|
[9] |
.
[J]. Modern Manufacturing Engineering, 2022, 502(7): 104-107.
|
[10] |
.
[J]. Modern Manufacturing Engineering, 2021, 489(6): 17-24.
|
[11] |
.
[J]. Modern Manufacturing Engineering, 2021, 484(1): 58-63.
|
[12] |
Chen Yalin, Zhuang Liyang, Zhu Longbiao, Shao Xiaojiang, Wang Heng.
Research on path planing of parking system based on the improved Dijkstra algorithm
[J]. Modern Manufacturing Engineering, 2017, 443(8): 63-67.
|
[13] |
Jia Wei.
Research on method of component matching of CNC system based on description logic
[J]. Modern Manufacturing Engineering, 2017, 442(7): 56-62.
|
[14] |
Hao Nanhai.
Batch scheduling of 3D printing based on work-piece layout
[J]. Modern Manufacturing Engineering, 2017, 440(5): 55-58.
|
[15] |
XU Shuai, LI Yanwu, XIE Hui, NIU Xiaowei.
The PPO algorithm based on convolutional pyramid network to solve job-shop scheduling problem
[J]. Modern Manufacturing Engineering, 2025, 534(3): 19-30.
|