[1] LEE K J,LEE J K,CHOI S Y.A Spatial Scheduling System and its Application to Shipbuilding:DAS-CURVE[J].Expert System with Application,1996,10(3/4):311-324. [2] PARK K,LEE K,PARK S,et al.Modeling and solving the spatial block scheduling problem in a shipbuilding company[J].Computers Industrial Engineering,1996,30(3):357-364. [3] RAJ P.Solving spatial scheduling problem:an analytical approach.Proceeding of the 37th International Conference on Computers and Industrial Engineering[C].[S.l.]:[s.n.],2007:2002-2011. [4] 刘建峰,秦士元,应长春.船体分段制造日程计划的模拟与优化[J].中国造船,2000,41(4):13-21. [5] 郑俊丽,陈峰,江志斌,等.缩短最大完工时间的船舶分段空间调度算法[J].上海交通大学学报,2009,43(4):663-668. [6] 韩文民,季永胜,叶涛锋,等.基于虚拟流水线的船舶曲面分段建造调度研究[J].现代制造工程,2012(10):41-46,124. [7] 张志英,王蕾,江志斌,等.面向船体曲面分段建造的空间调度方法[J].上海交通大学学报,2008(4):569-573. [8] 张志英,曾燕慧,陈洁.基于多规则的船体分段建造空间调度方法[J].工业工程,2011,14(3):96-100. |