[1] 兵团统计局.新疆生产建设兵团2016年国民经济和社会发展统计公报[R].[出版地不详]:[出版者不详],2017. [2] 陈俊梅,石宇强.智能生产物流系统模型及平台研究[J].制造业自动化,2015(19):47-50. [3] 王肖明,李乃梁,黄启超,等.基于排队论的离散生产线在制品改善研究[J].组合机床与自动化加工技术,2016(7):139-142. [4] KARAM Y,YONGHO C,DAEWHAN K,et al.Bottleneck Detection Framework Using Simulation in a Wafer FAB[J].Transactions of the Society of CAD/CAM Engineers,2014,19(3):214-223. [5] 袁曙辉,赵艳萍.流程工业在制品库存的分段控制方法[J].工业工程,2008(1):44-47. [6] CRUZ F R B,KENDALL G,WHILE L,et al.Throughput Maximization of Queueing Networks with Simultaneous Minimization of Service Rates and Buffers[J].Mathematical Problems in Engineering,2012(2012):18. [7] MANI S G, METRI B.Optimization of Work-in-Progress Inventory of Bottleneck Process:A Case Study of Passenger Car Industry[J].Global Business Review,2014,15(4):49-58. [8] DIAMANTIDIS A C,PAPADOPOULOS C T.Markovian Analysis of a Discrete Material Manufacturing System with Merge Operations,Operations-dependent and Idleness Failures[J].Computer & Industrial Engineering,2006,50(4):466-487. [9] 孟凡力,谈大龙,黄雪梅.装配系统中缓冲区容量的研究[J].计算机集成制造系统,2005,11(11):1609-1615. [10] 张登峰,管伟.装配现场在制品定额设定方法[J].现代制造工程,2015(8):101-105. [11] CHASE R B,AQUILANO N J,JACOBS F R.运营管理[M].9版.北京:机械工业出版社,2002:674-675. |