[1] 侯炜.SPS在汽车总装生产过程中的应用[J].上海汽车,2010(10):50-53. [2] 耿炜.零件分拣系统(SPS)项目在上海通用(沈阳)北盛汽车的实施[J].辽宁工业大学学报(自然科学版),2009,29(3):187- 189. [3] 马士华,龚凤美,刘风华.基于集配中心的生产和配送协同决策研究[J].计算机集成制造系统,2008,14(12):2421-2430. [4] GONG Fengmei,MA Shihua.The research on the mode of third party logistics point-of-use delivery based on supply hub[J].In-dustrial Technology & Economy,2007,26(8):124-127. [5] PUNDOOR G.Integrated production-distribution scheduling in supply chains[D].College Park,Md.,USA:University of Maryland,2005. [6] 左晓露,刘志学,郑长征.汽车零部件循环取货物流模式的分析与优化[J].汽车工程,2011,33(1):79-84. [7] KHOUJA M.Synchronization in supply chains:implications for design and management[J].Journal of the Operational Research Society,2003,54(9):984-994. [8] 龚凤美,马士华.基于Supply Hub的第三方物流直送工位模式研究[J].工业技术经济,2007,26(8):124-127. [9] 王炬香,于晓光,于明进.汽车制造企业的精益物流规划和管理[J].工业工程,2004,7(1):22-25. [10] ARRUDA E F,VAL J B R .Stability and optimality of a multiproduct production and storage system under demand uncertainty[J].European Journal of Operational Research,2008,188(2):406-427. |