Modern Manufacturing Engineering ›› 2018, Vol. 457 ›› Issue (10): 8-16.doi: 10.16731/j.cnki.1671-3133.2018.10.002

Previous Articles     Next Articles

Research on related artifacts job shop scheduling problem based on influence degree

Liu Shenghui1, Teng Fangyuan2, Zhang Shuli1   

  1. 1 College of Software,Harbin University of Science and Technology,Harbin 150080,China;
    2 College of Computer Science and Technology,Harbin University of Science and Technology, Harbin 150080,China
  • Received:2017-03-17 Online:2018-10-20 Published:2019-01-07

Abstract: In the actual production of discrete manufacturing enterprises,the related artifacts job shop scheduling problem is common and practical.Aiming at related artifacts job shop scheduling problem,the definition and mathematical description of related artifacts job shop scheduling problem are described in detail.The Partial Relation (P-R) diagram model is designed with the shortest duration.The methods,rules and steps of P-R diagram model are introduced.To solve the P-R diagram model,a double-order algorithm based on the influence degree is designed,and use cross linked list data structure to represent the computer storage form of P-R diagram model.Finally,the effectiveness of P-R diagram model and algorithm is verified by an example.

Key words: related artifacts, Partial Relation (P-R) diagram, influence degree, double-order, cross linked list

CLC Number: 

Copyright © Modern Manufacturing Engineering, All Rights Reserved.
Tel: 010-67126028 E-mail: 2645173083@qq.com
Powered by Beijing Magtech Co. Ltd