[1] Liu Yu,Chen Yiming,Jiang Tao. On sequence planning for selective maintenance of multi-state systems under stochastic maintenance durations[J]. European Journal of Operational Research,2018,268(1):113-127. [2] 张兆民,闫伟,何曙光,等.不完美维修下考虑结构依赖的多态串并联系统选择性维修策略优化[J].工业工程与管理,2024,29(4):139-147. [3] Wang Wenbin. A model of multiple nested inspections at different intervals[J]. Computers & Operations Research,2000,27(6):539-558. [4] Barlow R,Hunter L. Optimum preventive maintenance policies[J]. Operations Research,1960,8(1):90-100. [5] Wang Wenbin. Models of inspection,routine service,and replacement for a serviceable one-component system[J]. Reliability Engineering & System Safety,2013,116:57-63. [6] 禹润田,刘宇倩,王鹏翔.水下装备预防性维修策略研究[J].电声技术,2023,47(4):42-45. [7] 龙云,李荣康,张妍平,等.多级维修方式下的水下采油树视情维修方法[J].科学技术与工程,2024,24(22):9365-9373. [8] 林琳,罗斌,钟诗胜.基于视情维修的机队维修决策方法[J].计算机集成制造系统,2019,25(3):661-672. [9] Wang Wenbin,Dragan Banjevic,Michael Pecht.A multi-component and multi-failure mode inspection model based on the delay time concept[J]. Reliability Engineering & System Safety,2010,95(8):912-920. [10] 黎新龙,冉琰,张根保,等.考虑维修效果差异性的顺序预防性维修策略[J].上海交通大学学报,2023,57(11):1522-1530. [11] Wang Jiantai, Zhou Shihan, Peng Rui, et al. An inspection-based replacement planning in consideration of state-driven imperfect inspections[J]. Reliability Engineering & System Safty, 2022,232 :109064. [12] 薛丽.基于虚拟仿真的民机维修可操作性分析方法研究[D].天津:中国民航大学,2023. [13] 赵潇.基于多目标决策的单部件系统预防性维修联合优化策略研究[D].北京:北京科技大学,2021. [14] Cai Jing, Zuo Hongfu, Xu Yiming. Maintenance cost analysis under different inspection levels for aircraft structure[C]//2010 Prognostics and System Health Management Conference. Macao,China:IEEE,2010:1-7. [15] Mohamad M,Alaa E,Kamran S,et al. A delay time model with multiple defect types and multiple inspection methods[J].IEEE Transaction Reliability,2017,66(4):1073-1084. [16] 邱云峰,班元朗,陈林. 基于BP神经网络的晶体管寿命预测研究[J]. 科学技术创新,2022(35):100-103. [17] 胡卜元,王德波. 基于GA-BP神经网络模型的石墨烯发声器研究[J]. 传感技术学报,2024,37(10):1764-1769. [18] 陈永春,黄宋魏,和丽芳,等. 基于SSA-BP神经网络的重力式矿浆浓度检测算法[J]. 化工自动化及仪表,2024,51(6):1010-1016,1027. [19] 刘庆杰,刘博亮,冯青松,等. 基于SSA-GA-BP神经网络的城轨地下线振动源强预测模型[J]. 铁道科学与工程学报,2025,22(5):2355. [20] Wang Ling,Hu Haijun,Wang Yuqiao,et al. The availability model and parameters estimation method for the delay time model with imperfect maintenance at inspection[J]. Applied Mathematical Modelling,2011,35(6):2855-2863. [21] Yang Li,Ye Zhisheng,Lee Chi-Guhn,et al. A two-phase preventive maintenance policy considering imperfect repair and postponed replacement[J]. European Journal of Operational Research,2019,274(3):966-977. [22] Rumelhart O E, Hinton G E, Williams R J. Learning representations by back-propagating errors[J]. Nature, 1986,323(6088):533-536. [23] 王雨芹. 遗传算法在辐射防护中的应用[J]. 电子技术与软件工程,2022(14):143-146. |