[1] GANIA I P, STACHOWIAK A, OLESKÓW-SZLAPKA J. Flexible manufacturing systems: Industry 4.0 solution[J]. Idea,2017,10(1):7-11. [2] XIE J, GAO L, PENG K, et al. Review on flexible job shop scheduling[J]. IET Collaborative Intelligent Manufacturing,2019,1(3):67-77. [3] WANG Y, GE J, MIAO S, et al. Application of hybrid artificial bee colony algorithm based on load balancing in aerospace composite material manufacturing[J]. Expert Systems with Applications,2023,215:119375. [4] DING H, GU X. Hybrid of human learning optimization algorithm and particle swarm optimization algorithm with scheduling strategies for the flexible job-shop scheduling problem[J]. Neurocomputing,2020,414:313-332. [5] 闫富乾,石致远,王立闻. 基于改进灰狼算法的柔性作业车间动态节能分批调度问题[J]. 现代制造工程,2024(1):24-32,161. [6] 张国辉,张得雨,闫少峰,等. 考虑工人协作与学习效应的柔性作业车间调度[J/OL]. 计算机集成制造系统:1-23 [2024-09-19]. https://doi.org/10.13196/j.cims.2023.0491. [7] 梁志珍,王晓佳. 双资源约束的柔性作业车间鲁棒调度方法[J]. 机械工程学报,2024,60(6):114-126. [8] GOTHWAL S, RAJ T. Different aspects in design and development of flexible fixtures: review and future directions[J]. International Journal of Services and Operations Management, 2017,26(3):386-410. [9] WANG U. Top-level design of integrated manufacturing system for capital spaceflight machinery company[J]. Aerospace Manufacturing Technology,2005,10(5):8-12. [10] WU X, PENG J, XIAO X, et al. An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading[J]. Journal of Intelligent Manufacturing,2021,32:707-728. [11] ZHOU Y, DU S, LIU M, et al. Machine-fixture-pallet resources constrained flexible job shop scheduling considering loading and unloading times under pallet automation system[J]. Journal of Manufacturing Systems,2024,73:143-158. [12] 李昱硕,王思阳,刘晓腾,等. 考虑夹具-托盘约束的柔性作业车间调度[J]. 机械设计与研究,2022,38(5):195-200,209. [13] ROPKE S, PISINGER D. An adaptive large neighborhood search heuristic for the pickup and delivery problem with time windows[J]. Transportation Science,2006,40(4):455-472. [14] LIAO X, ZHANG R, CHEN Y, et al. A new artificial bee colony algorithm for the flexible job shop scheduling problem with extra resource constraints in numeric control centers[J]. Expert Systems with Applications,2024,249:123556. [15] LIU J, SUN B, LI G, et al. Multi-objective adaptive large neighbourhood search algorithm for dynamic flexible job shop schedule problem with transportation resource[J]. Engineer-ing Applications of Artificial Intelligence,2024,132:107917. [16] ZHANG G, GAO L, SHI Y. An effective genetic algorithm for the flexible job-shop scheduling problem[J]. Expert Systems with Applications,2011,38(4):3563-3573. [17] 张超勇,饶运清,刘向军,等. 基于POX交叉的遗传算法求解Job-Shop调度问题[J]. 中国机械工程,2004,15(23):83-87. [18] ADAMS J, BALAS E, ZAWACK D. The shifting bottleneck procedure for job shop scheduling[J]. Management Science,1988,34(3):391-401. [19] 王玉芳,陈凡,姚彬彬,等. 改进文化基因算法求解双资源约束柔性作业车间调度问题[J]. 控制工程,2024,31(6):981-994. [20] BRANDIMARTE P. Routing and scheduling in a flexible job shop by tabu search[J]. Annals of Operations Research,1993,41(3):157-183. [21] ANSARI T, CHANDRA G, GUPTA P K, et al. Synthesis of pine needle cyanoethyl cellulose using Taguchi L25 orthogonal array[J]. Industrial Crops & Products,2023,191:115973. [22] 郭鹏,赵文超,雷坤. 基于改进Jaya算法的双资源约束柔性作业车间调度[J]. 吉林大学学报(工学版),2023,53(2):480-487. [23] WU R, LI Y, GUO S, et al. Solving the dual-resource constrained flexible job shop scheduling problem with learning effect by a hybrid genetic algorithm[J]. Advances in Mechanical Engineering,2018,10(10):1-14. |