[1] |
LIAO Xuechao, XIANG Guihong, RUAN Bing, TIAN Ruili, ZHONG Shi.
Research on flexible job-shop scheduling problem with AGV quantity constraints
[J]. Modern Manufacturing Engineering, 2025, 537(6): 11-21.
|
[2] |
LI Jianru, GONG Yanjue, ZHAO Fu.
Joint space trajectory planning of robot based on hybrid genetic particle swarm optimization
[J]. Modern Manufacturing Engineering, 2025, 537(6): 84-91.
|
[3] |
HUANG Kaiqi, XIONG Yi.
Research on electromechanical-magnetic coupling dynamics and robust predictive control of eccentricity in hub motors
[J]. Modern Manufacturing Engineering, 2025, 536(5): 144-152.
|
[4] |
CHEN Dehai, TIAN Senyan, LI Zhijun, WANG Haifeng.
Optimization design of eccentric magnetic pole of permanent magnet synchronous motor based on analytical calculation and GA
[J]. Modern Manufacturing Engineering, 2025, 536(5): 153-160.
|
[5] |
LIU Jinfei, LIU Yihan, CHEN Ming, HUANG Hua.
Intelligent workshop scheduling with multiple varieties and variable batches based on improved IGA
[J]. Modern Manufacturing Engineering, 2025, 535(4): 1-10.
|
[6] |
XUE Huan, ZHANG Luoyuan, ZHANG Wenqian, XU Saiqing, PENG Xiaojian, GUO Chang, SU Ziao.
Residual stress prediction and process optimization of ultrasonic impact treatment for laser welding sheet based on IDBO-BP and PSO
[J]. Modern Manufacturing Engineering, 2025, 534(3): 9-18.
|
[7] |
WANG Chun, ZHANG Chaoyang, JI Weixi, LU Jingyu.
Research on optimization of production scheduling in discrete workshops considering equipment degradation
[J]. Modern Manufacturing Engineering, 2025, 534(3): 31-40.
|
[8] |
LIU Liang, HE Yuming, QI Siyuan.
Optimization study of flexible job-shop scheduling based on digital twin simulation
[J]. Modern Manufacturing Engineering, 2025, 534(3): 41-51.
|
[9] |
HUANG Kaiqi, HU Zhiqiang.
Multi-objective optimization of interconnected oil-gas suspension parameters for mining dump trucks
[J]. Modern Manufacturing Engineering, 2025, 534(3): 124-131.
|
[10] |
LI Juncong, HUANG Xiang, ZENG Jing, WANG Qunsheng.
Study on adaptive control strategy of hunting stability for high-speed trains
[J]. Modern Manufacturing Engineering, 2025, 533(2): 61-68.
|
[11] |
HUO Junjie, WANG Zhijian.
Process planning and workshop scheduling integrated optimization adopting new coding mode genetic algorithm
[J]. Modern Manufacturing Engineering, 2024, 528(9): 25-33.
|
[12] |
YANG Xingchen, CHANG Daofang.
Research on collaborative mixed flow production scheduling of multiple automobile factories in a limited buffer zone
[J]. Modern Manufacturing Engineering, 2024, 527(8): 9-18.
|
[13] |
WANG Yun, MA Rong, TANG Siyuan.
An IWOA for multi-objective optimization scheduling of AGV flexible job shop
[J]. Modern Manufacturing Engineering, 2024, 526(7): 17-25.
|
[14] |
ZHANG Miaomiao, HOU Rongguo, LÜ Zhe, WANG Longqing, SHI Guangxing, WANG Zhongqing.
Experimental study on the surface properties of AWJ surface strengthening 3D printed AlSi10Mg based on GA-GRNN
[J]. Modern Manufacturing Engineering, 2024, 526(7): 35-41.
|
[15] |
PEI Honglei.
Joint scheduling of multiple flexible workshops with serial and parallel heterogeneous process constraints
[J]. Modern Manufacturing Engineering, 2024, 525(6): 15-21.
|